ISO-NE I.3.9 Proposed Plan Application Approval Letters
Jan 2012
Determination, conducted by ISO-NE in accordance with Section I.3.9 of the ISO Tariff, that the Applicant's Proposed Plan will not have a significant adverse impact on the New England Transmission System.

Date Document Title Document Type  
Feb 03, 2012
NSTAR's Fairhave Wind Generation project as covered in NSTAr-11-G07
PDF (754k)
Feb 03, 2012
CTMEEC's South Norwalk Substation Project as covered in CTMEEC-11-T01
PDF (835k)
Feb 03, 2012
NSTAR's Kingston Wind Project as covered in NSTAR-11-G16
PDF (746k)
Feb 03, 2012
Highland Wind LLC and CMP's Highland Wind Generation and Transmission Project as covered in HW-12-G01, HW -12-T01, and CMP-12-T04
PDF (860k)
Feb 03, 2012
Pawtucket Power and NU's Altresco Generation Increase & SPS Modification Project as covered in PPHC-12-G01 and NU-12-X01
PDF (899k)
Feb 03, 2012
UI's 8300 Reconfiguration Project as covered in UI-12-T01, UI-12-T02, UI-12-T03
PDF (845k)
  Copyright ©2012 ISO New England Inc.