Active Customer & Asset Information
Comprehensive lists of all registered New England Power Pool (NEPOOL) Participants, metering domains, modeled generation, load and tie line assets.
Date Document Title Document Type
Jun 01, 2011 XLS (283k)
May 10, 2011 XLS (70k)
May 10, 2011 XLS (123k)
May 10, 2011 XLS (112k)
May 10, 2011 XLS (167k)
May 10, 2011 XLS (125k)
Mar 29, 2011 XLS (83k)
Nov 08, 2010 XLS (108k)
Aug 11, 2010
User guide for understanding the requirements and submitting the Tie-Line Asset Registration Form (ARF).
PDF (283k)
Aug 11, 2010
User guide for understanding the requirements and submitting the Load Asset Registration Form (ARF).
PDF (288k)
May 13, 2010
This form is to be used when submitting an Audit Request or Cancel for Demand Resources.
XLS (45k)
Jul 28, 2009 XLS (75.5k)
May 28, 2009
Certification letter for Multi-Generator Stations with no limiting elements.
DOC (36k)
May 28, 2009
Certification letter for fossil or combined cycle units with no steam exports.
DOC (37.5k)
May 09, 2008
User guide for understanding the requirements and submitting the Generator Asset Registration Form (ARF).
PDF (277k)


  Copyright ©2012 ISO New England Inc.