Compliance Interpretations
Includes Compliance Aids intended to Assist Market Participants in their Compliance Obligations with Respect to NERC Reliability Standards.

Date Document Title Document Type  
Jan 20, 2012
Acceptable Corroborating Evidence: "Reliability Directives Issued by the Reliability Coordinator Are Not Applicable to Load-Serving Entities, Purchasing-Selling Entities or Transmission Service Providers in New England."
PDF (210k)
Jan 20, 2012
Acceptable Corroborating Evidence: "Standards Pertaining to Dynamic Scheduling Do Not Apply in New England at This Time"
PDF (192k)
Jan 20, 2012
Acceptable Corroborating Evidence: "All New England Customers Must Purchase Schedule 2 'Reactive Supply and Voltage Control from Generation Source Service', per ISO-NE Tariff, II.4."
PDF (87.3k)
Jan 20, 2012
Acceptable Corroborating Evidence: "Deficient Load-Serving Entities Are Not Required to Request the Reliability Coordinator to Initiate an Energy Emergency Alert in New England."
PDF (207k)
Jan 20, 2012
A.C.E: "Determination of Inclusion in the Metered Boundaries of ISO-NE for Generator Operators, Transmission Operators and Load-Serving Entities Operating in the Balancing Authority's Area."
PDF (221k)
Jan 20, 2012
Acceptable Corroborating Evidence: "Standards Pertaining to Under Voltage Load Shedding Programs Do Not Apply in New England at This Time"
PDF (207k)
Jan 20, 2012
A.C.E: "Determinants for Assessing Compliance with FAC-008-1, Facility Ratings Methodology and FAC-009-1, Establish and Communicate Facility Ratings When Auditing TOs and GOs operating within the New England Balancing Area."
PDF (248k)
Jan 20, 2012
A.C.E: "ISO-NE provides email notification to NPCC/Auditors if an entity does not provide Generator Step Up and Auxiliary Transformer information to ISO-NE within 30 calendar days of a request for such data."
PDF (212k)
Jan 20, 2012
INT-001-3, R1 & 1.1, INT-004-2, R2, 2.1, 2.2, 2.3, IRO-001-1.1, R8, IRO-005-3a, R10, TOP-005-2a, R3, VAR-001-2, R5; A.C.E: "Standards Pertaining to Purchasing-Selling Entity functions in New England."
PDF (98.1k)
Jan 20, 2012
Acceptable Corroborating Evidence: "Standards pertaining to Operating within the most Limiting Parameter"
PDF (209k)
Jan 20, 2012
Acceptable Corroborating Evidence: "Standards Pertaining to Loss of Control Center Functionality"
PDF (208k)
Jan 20, 2012
Acceptable Corroborating Evidence: "Standards Pertaining to Assessments for Interconnecting New Facilities"
PDF (215k)
Jan 20, 2012
Acceptable Corroborating Evidence: "Standards pertaining to Rendering Emergency Assistance"
PDF (207k)
Jan 20, 2012
Acceptable Corroborating Evidence: "ISO-NE provides email notification to NPCC/Auditors if a Generator Owner fails to comply with any ISO-NE requirement to modify a Generator Step Up Transformer tap position."
PDF (214k)
  Copyright ©2012 ISO New England Inc.