| Jan 20, 2012 |
Acceptable Corroborating Evidence: "Reliability Directives Issued by the Reliability Coordinator Are Not Applicable to Load-Serving Entities, Purchasing-Selling Entities or Transmission Service Providers in New England." |
 |
PDF (210k) |
| Jan 20, 2012 |
Acceptable Corroborating Evidence: "Standards Pertaining to Dynamic Scheduling Do Not Apply in New England at This Time" |
 |
PDF (192k) |
| Jan 20, 2012 |
Acceptable Corroborating Evidence: "All New England Customers Must Purchase Schedule 2 'Reactive Supply and Voltage Control from Generation Source Service', per ISO-NE Tariff, II.4." |
 |
PDF (87.3k) |
| Jan 20, 2012 |
Acceptable Corroborating Evidence: "Deficient Load-Serving Entities Are Not Required to Request the Reliability Coordinator to Initiate an Energy Emergency Alert in New England." |
 |
PDF (207k) |
| Jan 20, 2012 |
A.C.E: "Determination of Inclusion in the Metered Boundaries of ISO-NE for Generator Operators, Transmission Operators and Load-Serving Entities Operating in the Balancing Authority's Area." |
 |
PDF (221k) |
| Jan 20, 2012 |
Acceptable Corroborating Evidence: "Standards Pertaining to Under Voltage Load Shedding Programs Do Not Apply in New England at This Time" |
 |
PDF (207k) |
| Jan 20, 2012 |
A.C.E: "Determinants for Assessing Compliance with FAC-008-1, Facility Ratings Methodology and FAC-009-1, Establish and Communicate Facility Ratings When Auditing TOs and GOs operating within the New England Balancing Area." |
 |
PDF (248k) |
| Jan 20, 2012 |
A.C.E: "ISO-NE provides email notification to NPCC/Auditors if an entity does not provide Generator Step Up and Auxiliary Transformer information to ISO-NE within 30 calendar days of a request for such data." |
 |
PDF (212k) |
| Jan 20, 2012 |
INT-001-3, R1 & 1.1, INT-004-2, R2, 2.1, 2.2, 2.3, IRO-001-1.1, R8, IRO-005-3a, R10, TOP-005-2a, R3, VAR-001-2, R5; A.C.E: "Standards Pertaining to Purchasing-Selling Entity functions in New England." |
 |
PDF (98.1k) |
| Jan 20, 2012 |
Acceptable Corroborating Evidence: "Standards pertaining to Operating within the most Limiting Parameter" |
 |
PDF (209k) |
| Jan 20, 2012 |
Acceptable Corroborating Evidence: "Standards Pertaining to Loss of Control Center Functionality" |
 |
PDF (208k) |
| Jan 20, 2012 |
Acceptable Corroborating Evidence: "Standards Pertaining to Assessments for Interconnecting New Facilities" |
 |
PDF (215k) |
| Jan 20, 2012 |
Acceptable Corroborating Evidence: "Standards pertaining to Rendering Emergency Assistance" |
 |
PDF (207k) |
| Jan 20, 2012 |
Acceptable Corroborating Evidence: "ISO-NE provides email notification to NPCC/Auditors if a Generator Owner fails to comply with any ISO-NE requirement to modify a Generator Step Up Transformer tap position." |
 |
PDF (214k) |